New research highlights accessibility challenges for disabled passengers during rail disruption

New analysis from Great British Rail Replacement (GBRR) has highlighted the logistical challenges of responding to major rail disruptions, with accessibility emerging as a key concern for disabled passengers and people with reduced mobility.
According to GBRR, part of CMAC Group, rail operators can have as little as 15 to 30 minutes to assess the scale of a major disruption and begin arranging alternative transport for affected passengers.
The findings highlight the importance of rapid decision-making, effective coordination and accessible transport provision, particularly for passengers who rely on wheelchair-accessible vehicles or additional assistance when travelling.
With more than 80,000 rail services fully or partially cancelled across Great Britain between January and March 2026, the analysis underlines the challenges facing operators when unexpected disruption occurs.
GBRR explains that arranging rail replacement services involves considerably more than simply sourcing buses or taxis.
Operators must assess passenger demand, identify suitable routes, consider accessibility requirements and evaluate operational factors before deciding which transport arrangements are most appropriate.
Ian Jeffrey, Director of Great British Rail Replacement, said: “When disruption occurs, the response begins immediately. Establishing control, validating demand and mobilising the right mix of transport all happen in parallel.
“It is not about indiscriminately booking vehicles, but quickly understanding the incident and deploying the most appropriate response.”
The analysis draws attention to the difficulties faced by disabled passengers when rail services are disrupted.
According to GBRR’s Rail Accessibility White Paper, just 2.8 per cent of disabled passengers surveyed considered rail replacement services fully accessible.
Meanwhile, 30 per cent reported having been left without a viable alternative during disruption.
The findings raise concerns about whether existing rail replacement arrangements adequately meet the needs of wheelchair users and other passengers with reduced mobility.
Ensuring suitable accessible vehicles are available, alongside clear passenger information and coordinated assistance, is therefore an important part of disruption planning.
GBRR also highlights the need for operators to consider station accessibility and the suitability of alternative routes when arranging replacement transport.
Once the scale of a disruption has been established, identifying suitable vehicles and drivers can present further difficulties.
Potential replacement vehicles may already be committed to school transport, scheduled services, private hire, tourism or airport transfers.
Driver-hours regulations, depot locations, weather conditions and road accessibility can also affect the speed at which vehicles can be deployed.
Geographical differences add another layer of complexity. In urban areas, operators may face high passenger volumes, traffic congestion and limited space around stations. Rural routes, meanwhile, can involve longer journeys, fewer available transport providers and more difficult station access.
GBRR notes that these challenges can influence passenger confidence, with research indicating that 19 per cent of rural customers have cancelled travel plans because they believed disruption arrangements would be inadequate.
GBRR says effective rail replacement provision requires continuous communication between train operating companies, control rooms, station teams and transport suppliers.
Transport arrangements may need to change as passenger numbers fluctuate, traffic conditions develop or the expected duration of disruption becomes clearer.
Phil Sutton, Senior Rail Business Manager at Great British Rail Replacement, said: “When disruption occurs on the rail network, speed, visibility, and coordination are critical to keeping passengers moving.
“As soon as potential disruption is identified, GBRR proactively engages its nationwide supplier network to assess capacity and secure vehicles before passenger demand escalates.”
The organisation believes that effective rail replacement services should form part of wider rail network resilience planning rather than being treated solely as an emergency response.
This includes considering supplier coverage, driver and vehicle availability, accessibility information and accurate station and route data before incidents occur.
For disabled passengers and those with reduced mobility, such planning could play an important role in ensuring that alternative transport arrangements are both practical and accessible when rail services are interrupted.
Further information about the findings is available here.


